Brisbane | Mackay | Townsville | Cairns

James Cook University Central Energy Plant

James-Cook-University-Central-Energy-Plant

Cairns
Project Value: $18M
Infrastructure upgrade involving site wide high voltage network upgrade to campus and electrical services for new plant building. LED lighting was utilised internally and externally throughout the building.

A new service trench (1600m) was constructed to connect new Central Energy Plant to existing buildings. New Central Energy Plant involved tilt up construction together with cooling tower supports.

Engineer:Jill Parsons (Electrical)
Engineer:Stephen Tobias (Structural)
Engineer:Ken Miller (Civil)
Architect: Clarke & Prince

Click to view more projects