Project Description

STP Consultants were engaged in the Structural, Civil, Mechanical, Hydraulic and Fire services to extend the existing Residential Care Facility. The facility will add an extra 20 additional beds on the western side of the facility. The additional resources will allow the facility to cater up to 52 beds. The extension consisted of two separate wings being House A and House B. House A consisted of 10 beds, each paired with an associated ensuite, sitting area, storage areas, dining room, server and lounge room. House B mirror House A with the two buildings linked by a covered walkway. Our Fire Services also undertook a Fire Sprinkler Audit on Tully Nursing Home. The audit consisted of inspecting site and writing a report within a timely manner.

Project Value:

n/a

Role:

Structural/Civil/Mechanical/Electrical/Hydraulic and Fire Engineer

Client Referee:

Paynter Dixon -(07) 3367 4600

Timeline:

Current